Anaya's Painting
Newly built two story white stucco home with black windows at dusk, freshly painted exterior

Builder & Custom Home Painting

New Construction Painting in Pacific Palisades, Santa Monica, & Marina Del Rey

Sprayed interiors, crisp trim and a finished exterior, delivered on your build calendar.

Painters for Builders

Professional New Construction Painting

On a new build, paint is the finish everybody sees and nobody forgives. A wavy wall, a fuzzy line where the trim meets the drywall, a front door that shows roller stipple. Those are the things a buyer stops on during the walkthrough, and they are the things we take off the punch list before anybody writes them down.

We work the way a builder needs us to work. Our crew shows up when drywall is signed off, sprays and back rolls the whole house, then comes back for trim, doors and the final coat after the other trades clear out. You get a date, and we hold it.

General contractors, custom home builders and homeowners doing a ground up project across the Westside call us because the finish holds up under the lighting design and the schedule holds up under the loan.

  • Sprayed and back rolled walls and ceilings
  • Factory smooth trim, doors and cabinetry
  • Sequenced around drywall, floors and cabinet install
  • Punch list walk before your final inspection
Empty new construction great room with freshly painted white walls, tall ceilings and new oak floors

Framing up and need paint on the calendar?

Send us the plans and your drywall date. We will price the whole scope and hold a slot for your crew.

Two painters in neon hi-vis shirts spraying primer on new drywall inside a house under construction

How We Work

Our Process

A new build has a rhythm to it. Here is how our part of that rhythm runs from bare drywall to the day you hand over the keys.

  1. 1

    Read the plans before we bid

    We count doors, windows, linear feet of trim, ceiling heights and any specialty finish so the number you get is the number you pay.

  2. 2

    Lock the sequence with your super

    Paint touches a build three or four separate times. We map those visits against drywall, flooring, cabinets and trim so nobody is standing on top of anybody.

  3. 3

    Prime the shell

    Once drywall passes, we spray a full coat of primer. That coat is also a flashlight, it shows every seam and nail pop that still needs attention.

  4. 4

    Point up and sand

    Anything the primer exposed gets patched, sanded and spot primed. This is the step that separates a smooth wall from a wall that only looks smooth until the sun hits it.

  5. 5

    Spray and back roll the finish

    Walls and ceilings get two finish coats. Spraying lays the material down fast, back rolling works it into the texture so the sheen stays even across a long wall.

  6. 6

    Trim, doors and the final walk

    Base, casing, crown and doors get a sprayed enamel after floors are protected. Then we walk the house with your super, mark the punch list and clear it.

Attention to Detail

The Preparation Process

On a brand new house the surfaces are clean, so prep is about protection and flatness. Here is what happens before the sprayer gets picked up.

  • Drywall walked with a light before a drop of paint goes on
  • Seams, nail pops and corner bead dings patched and sanded flat
  • Windows, sliders and skylights masked in plastic before spraying
  • Floors papered or covered once finish material is in the house
  • Cabinets, counters and hardware bagged before enamel work starts
  • Caulk on every trim joint so the lines stay tight after the house settles
  • Debris hauled out daily so other trades can keep moving
Rooms in a new home masked with taped floor paper, plastic on windows and blue tape on door frames

Client Reviews

What Builders Say About Our New Construction Work

Gabriel Rivera

Gabriel Rivera

We build four or five custom homes a year and paint used to be the trade that blew the schedule. These guys primed the day after drywall signed off and came back for trim exactly when they said they would. The walls on our Bel-Air project are dead flat under can lights, which is the hardest test there is.
Scroll to read the full review
Martha Georgie

Martha Georgie

Our ground up house in Hidden Hills had eighteen foot ceilings and a lot of trim detail. They sprayed everything, caulked every joint and the punch list at the end was three items. Our super said it was the shortest paint punch he has ever handed in.
Scroll to read the full review
Andres Jr

Andres Jr

They painted our new place in Manhattan Beach from bare drywall to move in. What I noticed most was how clean the site stayed. Floors covered, trash out every day, and the doors came back looking like they were finished in a shop instead of on site.
Scroll to read the full review
Swipe to read more reviews

Good Questions

New Construction Painting FAQs

When should paint come into the build schedule?

Our first visit is right after drywall is taped, textured and signed off, before flooring and cabinets show up. We prime the whole shell then, because primer is the coat that shows every seam and nail pop while the house is still easy to fix. Our second visit is finish coats on walls and ceilings, usually before cabinet install. The last visit is trim, doors and touch up after the other trades are done making dents. Three visits, mapped to your calendar, so paint never becomes the thing everybody is waiting on.

How long does painting a new house take?

A 2,500 to 3,500 square foot home runs about eight to twelve working days of paint labor total, but that labor is spread across the build. Prime and point up is two or three days. Wall and ceiling finish coats are three or four. Trim, doors and enamel work is another three to five depending on how much millwork is in the plans. Bigger custom homes with high ceilings, coffered detail or specialty finishes take longer, and we give you a day by day calendar with the bid so your other trades can plan around it.

Do you spray or brush and roll?

Both, and the choice depends on the surface. Walls and ceilings get sprayed and back rolled, which lays the material down evenly and works it into the texture so the sheen does not flash. Trim, doors and cabinetry get sprayed with an enamel so there is no brush mark or roller stipple. Anything tight to a finished surface, like a wall meeting new tile, gets cut in by hand. Spraying alone is faster but back rolling is what makes the wall hold up when the afternoon light rakes across it.

Can you match the architect or designer color schedule?

Yes. Send the color schedule and we order the material to those exact formulas from the manufacturer the spec calls for. If the schedule lists a color from one brand and you want another brand for durability, we will tell you how close the match really is instead of promising it is identical. We also spray sample boards or a section of actual wall so the designer can approve the color under the lighting that will be in the house, which matters because LED trims shift a color noticeably.

What about the exterior on a new build?

New stucco needs to cure before it takes paint, generally around 30 days, and we test the surface rather than guessing. Once it is ready we spray a masonry primer, then two coats of an elastomeric or high grade acrylic depending on the exposure. Fascia, eaves, garage doors, railings and the front door all get their own prep and product. On coastal projects in Santa Monica, Malibu or Marina del Rey we spec coatings rated for salt air, because a builder grade product will chalk within a couple of seasons out there.

Who handles the punch list at the end?

We do, and we would rather find the items than have your buyer find them. Before final inspection we walk the whole house with your superintendent, flashlight in hand, and mark anything that needs another pass. We also leave labeled touch up kits for every color in the house so the homeowner or your warranty crew has the exact material a year down the road. If something shows up during the warranty walk that is on us, we come back and handle it.

Do you work with owner builders, not just general contractors?

Absolutely. Plenty of our new construction work is for homeowners building their own place, sometimes for the first time. In that case we spend more time explaining the sequence, what has to happen before we can start and what decisions you need to make and when, like picking trim sheen before the enamel order goes in. You get the same schedule and the same finish, just with more hand holding through the parts that are new to you.

Let's Get Your Build Finished Right

Anaya's Painting works with builders and homeowners in Pacific Palisades, Santa Monica, Marina del Rey, Bel-Air and across the Westside. Call us or send the plans to get a paint date on the calendar.

1639 11th St, Suite 100, Santa Monica, CA 90404