
Commercial Painting Services
Office Building Painters in Santa Monica, Westwood, & Culver City
Lobbies, suites and hallways brought back to new while your tenants keep working.
Office Painting Contractors
Professional Office Building Painting
An office building is the first thing a client sees before they ever shake a hand. Scuffed corridors, a tired lobby and a chalky exterior say something you probably do not want said. Fresh paint fixes that faster and cheaper than almost anything else you could do to the property.
Our office painters work around occupied space. That means evening and weekend shifts, floor by floor phasing, low odor products and a crew that treats a tenant suite like somebody is coming back to sit in it at eight the next morning, because they are.
Property managers around the Westside call us for turnovers, common area refreshes and full building repaints on a schedule they can hand to ownership.
- Evening and weekend shifts for occupied floors
- Low odor coatings so suites are usable next morning
- Elevators, lobbies and stairwells kept clean and open
- Certificates of insurance sent before we mobilize

Have a suite turning over next month?
Send the floor plan and we will price the paint scope so you can budget it before the tenant moves out.

How We Work
Our Process
Office work is about staying out of the way. Here is how a building repaint runs so tenants barely notice we were there.
- 1
Walk the building floor by floor
We look at lobbies, corridors, stairwells, restrooms, suites and the exterior, then note what needs patching before anyone talks color.
- 2
Scope written by area
The bid breaks out common areas, individual suites and exterior work so ownership can approve it in phases if the budget calls for that.
- 3
Phasing that respects tenants
We paint one wing or one floor at a time, mostly after hours, and give building management a notice sheet to post for tenants.
- 4
Protect the finishes you keep
Carpet gets papered and taped, workstations and copiers get covered, elevator cabs get padded and door hardware gets masked.
- 5
Patch, prime, then paint
Anchor holes, corner bead dings, water stains and old texture all get repaired and spot primed so the new coat reads even under office lighting.
- 6
Night walk and touch up
Management walks the finished area with us, we mark anything that needs another pass and handle it before the next shift starts.
Recent Buildings
Office Painting Photo Gallery
Lobbies, suites, corridors and building exteriors our crews painted for Westside property owners.






Attention to Detail
The Preparation Process
In an occupied building, protection matters as much as paint. Here is what happens before a roller ever touches a wall on your floor.
- Carpet and hard floors papered, taped and kept dry
- Workstations, monitors and copiers bagged and covered
- Anchor holes, dings and corner bead damage patched and sanded
- Water stains sealed with a stain blocking primer so they stay gone
- Door frames, outlets, switches and signage masked clean
- Elevator cabs and lobby finishes padded before material moves
- Every area vacuumed and put back before the building opens

More From Our Crew
Featured Painting Services
Interior Painting
Walls, ceilings, trim and doors painted room by room with tight lines.
Explore Interior PaintingExterior Painting
Stucco, siding and eaves prepped for coastal sun and morning fog.
Explore Exterior PaintingCabinet Painting
Doors sanded, primed and sprayed for a smooth kitchen finish.
Explore Cabinet PaintingCommercial Painting
Storefronts, restaurants and warehouses painted around your hours.
Explore Commercial PaintingNew Construction Painting
Sprayed interiors and trim delivered on the builder calendar.
Explore New Construction PaintingEpoxy Flooring
Garage and shop floors coated for a hard, easy to clean surface.
Explore Epoxy FlooringClient Reviews
What Property Managers Say About Our Office Painting

Martha Georgie
“We manage three buildings on Wilshire and had them repaint every common area. They worked six to midnight, posted notices for tenants and we never got a single complaint. That has never happened with a painting contractor before.”

Gabriel Rivera
“Suite turnover on a tight deadline. They patched about forty anchor holes, sealed two old water stains on the ceiling and had the whole floor painted in three nights. The new tenant walked in and thought it was new drywall.”

Andres Jr
“The lobby and stairwells looked twenty years old. Now the building shows well and our leasing agent says tours go better. They protected the elevator cabs and the tile, and cleanup every night was better than our janitorial.”
Good Questions
Office Painting FAQs
Can you paint while the building stays occupied?
Yes, that is most of what we do. Common areas like lobbies, corridors and stairwells get painted in the evening or on weekends so nobody is walking through wet paint on the way to a meeting. Vacant suites can be painted during the day. We phase the work floor by floor or wing by wing, and we give building management a simple notice tenants can read so everyone knows which areas are active on which nights.
How do you handle paint smell in an office?
We use low VOC and zero VOC coatings for interior office work, which cut the odor down dramatically compared to older products. We also run air movers and keep the HVAC coordinated with your engineer so air is moving the right direction. In practice, a suite painted at eight at night is comfortable to work in by the next morning. If somebody in the building has real sensitivity, tell us up front and we will schedule that area for a Friday night so it has the weekend.
How long does an office suite take to paint?
A single 2,000 to 3,000 square foot suite with walls, doors and frames is usually two to three nights, including patching. A full floor of common corridors runs three to five nights depending on length and how much drywall repair is in the scope. Building exteriors depend on height, access and whether we need lifts or swing stage. You get a night by night calendar with the bid so ownership can see the whole timeline.
Do you handle drywall repair and water stains too?
Yes. Offices collect anchor holes, corner bead dents from carts, and ceiling stains from old roof or plumbing leaks. We patch and sand the drywall, and stains get a stain blocking primer before paint so they do not ghost back through in six months. If a ceiling tile is damaged beyond patching we will tell you rather than painting over a problem.
Can you send a certificate of insurance to our landlord?
Yes, and we do it before the job starts. Most Westside office buildings require a COI naming the owner and management company as additional insured, plus specific liability limits. Send us the requirements with the bid request and we will have the certificate issued during scheduling so it is never the thing holding up your start date.
How do we pick colors for a whole building?
We usually start with a neutral base for corridors and suites that will not fight future tenant furniture, then add one accent color in the lobby or elevator lobbies to give the building some identity. We paint sample sections on the actual walls so you can look at them under your own lighting, which matters a lot in an office where fluorescent or LED light shifts the color. If ownership has a brand standard, we match it.
Do you paint the building exterior as well?
We do. Stucco, concrete, metal panel, doors, railings and parking structures are all part of our exterior work. Coastal buildings in Santa Monica and Marina del Rey take a beating from salt air, so we power wash, repair stucco cracks, replace failing caulk and use coatings rated for that exposure. We schedule exterior work to keep entrances and parking usable throughout.
Let's Freshen Up Your Office Property
Anaya's Painting works with owners and property managers in Santa Monica, Westwood, Culver City, Beverly Hills and across the Westside. Call us or send the building address to get on the schedule.
1639 11th St, Suite 100, Santa Monica, CA 90404
